Locking floor construction key points

1.The lick floor needs to be rehabilitated before construction, adapt to the environmental paving temperature! 

 2.Choose the best construction temperature !

 3.The length direction is about 10M-12M partition, and the width direction is about 8M partition!

 4.The need to maintain clean and smooth surface !

 5.Paving four weeks set aside 1CM contraction joints !

 6.The correct paving method for the lock! Make sure that the buckle is not damaged when paving!

 7.Avoid using click ”field” shaped paving way.